A ferry crossing on the Brazos since 1855
Concrete Contractors in Mumford, TX
Driveways, shop slabs and patios for homes on the Robertson County side of the river.
- Free visit to your property: we measure and check where water runs
- A written, line-item price before any concrete is ordered
- College Station right-of-way permits and steel inspections built into the schedule

Pouring Concrete Near the River
Mumford sits on the eastern bank of the Brazos River in Robertson County, and as concrete contractors we treat Mumford projects as river-bottom work from the start. The community was established in 1855, when Jesse Mumford ran a ferry over the Brazos nearby. In 1895 the first iron bridge near Mumford went across the river, and in 1899 a devastating flood destroyed most of the community. Wikipedia notes it never attained its pre-flood prosperity.
Lessons from the 1899 flood
That history is a reminder that the land near the river is low and has flooded before. Mumford sits at 259 feet, below most of the Brazos Valley. The Handbook of Texas describes the Brazos Bottom between the Brazos and Little Brazos rivers as fertile delta land covering about 150,000 acres. Fertile soil grows crops well, but it is not a natural base for concrete.
For slabs on bottomland we focus on:
- Removing soft, organic topsoil until we reach firm ground.
- Building up a compacted base of select fill or crushed stone, in thin lifts.
- Setting slab elevation high enough that standing water after rain does not sit on the surface.
- Reinforcing with rebar so the slab stays in one piece if the ground shifts.
- Keeping runoff moving away from buildings and slab edges.
If your property is in a mapped flood zone, check what the county requires before building anything new. We plan the slab around what we find.
A community with a new neighbor
In 2017 Union Pacific bought 1,875 acres near Mumford to build Brazos Yard, a rail classification yard projected to sort up to 1,300 cars a day and employ 200 workers when complete in 2020. A project that size brings new traffic and new interest in nearby land. For homeowners nearby, that can mean more truck traffic on local roads and more reason to build driveways, parking pads and shop slabs for heavier loads.
Raising a slab above the yard
On flat, low ground, the easiest way to keep water off a slab is to build it up. We bring in compacted fill to lift the slab a few inches above the surrounding yard, then grade the soil away from its edges. For a shop or barn, that also keeps the floor dry inside when heavy rain falls. The fill has to be placed in thin layers and compacted each time; dumping a thick layer and pouring over it leads to settlement within a year or two.
Driveways that carry heavy loads
Rural drives near Mumford often see farm trucks, trailers and service vehicles. A 4-inch slab is fine for cars, but heavier loads call for more thickness and steel. We also thicken the apron at the road, where turning wheels twist the slab edge. On low ground we raise the driveway slightly above the surrounding grade so it drains to the sides.
Slabs, patios and walks
Shop and barn slabs. Thickened edges, anchor bolts set to the building plans, and a finish suited to the use.
Patios. Broom finish or stamped concrete with integral color, pitched away from the house.
Walkways. Paths from the drive to the door or between buildings so mud stays outside.
Repair. Crack sealing, joint resealing and replacement of settled sections.
Weather and timing
Robertson County averages about 38 inches of rain a year, according to the Handbook, with July highs around 96 degrees. River-bottom ground stays wet longer after rain than upland ground does. We do not compact or pour on a saturated base; we wait for it to firm up. In summer we start early, keep the base damp and cure the slab right after finishing so the surface does not crack or dust.
Mumford is unincorporated, so we check with Robertson County about any requirements for your project before scheduling.
Mumford Background
- Founding. Established in 1855 near a ferry over the Brazos run by Jesse Mumford.
- 1899 flood. A devastating flood in 1899 destroyed most of the community, which never regained its earlier prosperity.
- Brazos Yard. Union Pacific bought 1,875 acres in 2017 for Brazos Yard, projected to sort up to 1,300 rail cars a day.
- River bottom. Mumford sits at 259 feet; the Brazos Bottom between the Brazos and Little Brazos covers about 150,000 acres of delta land.

Our Services in Mumford, TX
Mumford Questions
Can you build a good slab on river-bottom soil in Mumford?
Yes, with more site prep. We dig out soft topsoil, build a compacted base, raise the slab above the surrounding grade and reinforce it with rebar.
Should my driveway be thicker if trucks use it?
Yes. For regular truck or trailer traffic, a 5- or 6-inch slab with rebar and a thickened apron holds up much better than a standard 4-inch drive.
Who do I ask about permits in Mumford?
Mumford is unincorporated, so Robertson County is usually the office to check with. We confirm what applies before scheduling the work.
Free Estimates in Mumford, TX
Free estimates for Mumford and the Brazos bottoms.
Concrete Contractors Near Mumford
- Concrete Contractors in College Station, TX
- Concrete Contractors in Bryan, TX
- Concrete Contractors in Wellborn, TX
- Concrete Contractors in Kurten, TX
- Concrete Contractors in Wixon Valley, TX
- Concrete Contractors in Navasota, TX
- Concrete Contractors in Hearne, TX
- Concrete Contractors in Caldwell, TX
- Concrete Contractors in Millican, TX
- Concrete Contractors in Snook, TX
- Concrete Contractors in Anderson, TX
- Concrete Contractors in Calvert, TX
- Concrete Contractors in Franklin, TX
- Concrete Contractors in Somerville, TX
- Concrete Contractors in Iola, TX
- Concrete Contractors in Smetana, TX
- Concrete Contractors in Edge, TX
- Concrete Contractors in Brenham, TX
- Concrete Contractors in Benchley, TX